According to language included in the National Defense Authorization Act (NDAA), which passed out of the House Armed Services Committee on April 30, Congress is seeking answers to the recent surge in protests the last few years.
The NDAA has a provision instructing Defense to commission a study regarding how Defense contractors are using the protest process in their favor, or simply manipulating the system.
I believe the Government Accountability Office (GAO) has already addressed these issues in their latest report to Congress (here). Also troubling is the desire to use a Federally Funded Research and Development Center for this analysis, which is a troubling potential contracting issue in and of itself.
Allow me to answer the commission's questions and save the taxpayers untold millions:
The issues this “commission” is tasked with analyzing include: 
(1) If contractors who currently have a DoD contract enter a bid protest to delay the implementation of new contracts that would draw business away from the old one. The Government Accountability Office has up to 100 days to review a bid protest and render a decision.
I have had only one contractor be candid with me about it, but of course you are going to protest in this situation as the incumbent! Honestly, what do you have to lose? You lost the contract, and that is 3 extra months of revenue. What is the downside? Some would argue bad faith, strained customer relations, etc. Ninety more days of revenue trump these concerns, especially in this cutthroat, hyper-competitive government contracting market. 
(2) The extent to which companies file a bid protest even when they do not believe the Defense Department made an error in order to delay or otherwise disrupt the process.
I call these protests “sour grapes,” and no attorney worth their salt will admit to them, since the attorneys, in my opinion, are the only ones that win here. Some firms just get bad legal advice, other firms may just not know any better.
However, I have had several companies tell me that these protests were filedsimply because the risk averse contracting community is not providing enough information in the debrief process to give contractors confidence in the contract award decision.
Therefore, these protests are filed in hopes of digging up some dirt, and ultimately exerting pressure on the Contracting Officer for the ultimate goal of the protest and the third issue;
(3) Whether there are net benefits for companies filing a protest or indicating they plan on filing a protest.
The statistics show that this is the real path to protests, getting another bite at the apple in some form or fashion through corrective action. 
This effectiveness rate, which held steady at 43 percent of all cases filed last fiscal year, and as reported by the GAO, is the important figure. Nearly half of all protests ended by having the protested agency take some action. Those are pretty good betting odds.
This corrective action might take the form of pulling and rewriting objectionable parts of the solicitation, brokering with the protestor to win work with the winning contractor, or reevaluating the losing contractor's proposal.
The buying environment is creating the protests pressures on both sides, and the continued lack of communications and collaboration with industry by government exacerbates the issues. Further, many firms use protest after protest as part of their contract development strategy, with little consequence since the protest process is ripe for abuse. 
We do not need Congress to waste money on reports and committees that provide little useful information. Instead, taxpayers would be better served by properly resourcing government management and demanding accountability for results.

Monday, March 30, 2015

Reverse auctions need more scrutiny to curtail the win-lose situation

proxibid.com
Reverse auctions are back in the news yet again this week, highlighted by recent testimony before the House Small Business committee, in which the discussion revolved around the proper use of reverse auctions, and potential to harm both the government and industry without clear guidance and policy. 

This is nothing new. Government Accountability Office (GAO) reports were critical of the process, in addition to criticism by the Small Business Committee’s Contracting and Workforce Subcommittee, which held a joint hearing with the Veterans’ Affairs Committee’s Oversight and Investigations Subcommittee.

Firstly, I think reverse auctions are a great tool to save money, increase competition (especially for small businesses), and speed up procurement times. However, there is one caveat: when used appropriately.

On that note, one of the best articles on appropriate usage came from Stan Soloway of the Professional Services Council, who advised the proper use should come through simple commodity buys where requirements are not to any level of sophistication that warrant another buying method:

…Reverse auctions and strategic sourcing, along with the precipitous rise in low bid buying and efforts to create standardized labor rates that ignore how high performing businesses have to be run, reflect a broader and disturbing tendency toward commoditizing both people and capabilities. This trend assumes that the ability to do something minimally or adequately equates to doing it well, let alone exceptionally well. It understates the critical importance of historic performance and ignores the reality that high quality professional services and technology are highly nuanced and constantly evolving….

I have written about this issue in the past (click here), and the GAO report started the salvo of calling into the question the use of reverse auctions through disturbing findings at the center of testimony provided by Michelle Mackin, Director of Acquisition and Sourcing Management at the GAO:

…Competition and savings-two of the key benefits of reverse auctions cited by the agencies we reviewed-are not always being maximized… because not all reverse auctions involve what we refer to as interactive bidding, where vendors engage in multiple rounds of bids against each other to drive prices lower. We found that over a third of the fiscal year 2012 reverse auctions had no interactive bidding-and agencies paid $3.9 million in fees for these auctions…

Of course, one of the main issues with reverse auctions is the transparency and oversight of the process and the contracts themselves. Dan Gordon said in his hearing that this function is "inherently governmental." He also stated:

…FedBid has an organizational conflict of interest. They control the data. They control the information," said Gordon. "They have a financial interest in having as many reverse auctions as possible, regardless of whether the procurement is suitable for one…

The vast majority of reverse auctions are run through FedBid, the Vienna, VA, based company that got a slap on the wrist after an inspector general report from Veterans Affairs exposed major issues with ethics and business practices.

The most troubling issue is the negative consequences that happen more often than not to small businesses, as the race to the bottom continues to put undue pressure on companies that are already struggling to survive in this hyper-competitive federal market.

I hope that reverse auctions get a thorough review, because I feel it is doing more harm than good to both the taxpayer, and the firms that are using this practice in hopes of winning federal business. 

Saturday, December 14, 2013

Reverse Auctions: Where Are The Cost Savings?

Photo by artworldsalon.com
Photo by artworldsalon.com
Reverse auctions are back in the news this week, highlighted by a Government Accountability (GAO) report critical of the process, and by the Small Business Committee’s Contracting and Workforce Subcommittee, which held a joint hearing with the Veterans’ Affairs Committee’s Oversight and Investigations Subcommittee earlier this week as well.
The title of the hearing, Contracting Away Accountability – Reverse Auctions in Federal Agency Acquisitions, was a good indication of what Congress thought of the procurement tool.
Firstly, I think reverse auctions are a great tool to save money, increase competition (especially for small businesses), and speed up procurement times. However, there is one caveat: when used appropriately.
I have written about this issue in the past (click here), and the GAO report started the salvo of calling into the question the use of reverse auctions through disturbing findings at the center of testimony provided by Michelle Mackin, Director of Acquisition and Sourcing Management at the GAO
…Competition and savings-two of the key benefits of reverse auctions cited by the agencies we reviewed-are not always being maximized… because not all reverse auctions involve what we refer to as interactive bidding, where vendors engage in multiple rounds of bids against each other to drive prices lower. We found that over a third of the fiscal year 2012 reverse auctions had no interactive bidding-and agencies paid $3.9 million in fees for these auctions…
Further disturbing news in the report and testimony from Mackin was that many federal users did not understand that fees were associated with the reverse auction platform, most notably through the use of FedBid, a Vienna, Va.-based company that offers the most popular tool. FedBid charges a fee of 3 percent of the winning contract, not to exceed $10,000. However, FedBid can, and sometimes does, offer discounts on those fees.
…”We were, frankly, a bit surprised to learn that agencies didn’t know how much they were paying FedBid in fees. They didn’t know how much duplicative fees–for lack of a better word–they were paying when they were using a schedule contract, for example, for a reverse auction,” said Mackin…
Some agencies, such as the Department of Veterans Affairs (VA), are now trying to capture and track fee data, but it remains an illusive goal. VA had halted the use of reverse auctions last year, as according to Jan Frye, deputy assistant secretary at VA’s Office of Acquisition and Logistics, who said in a keynote at the April 26 Coalition for Government Procurement 2012 Spring Conference:
…“I’m not against reverse auctions, but I’m concerned that sometimes we don’t know what we’re doing when we set about to do reverse auctions”…
Apparently the doubt remains, as the VA has once again halted the use of reverse auctions this week, further pointing to issues on the use of this technique at the VA, and especially when it comes to construction contracts.
Also disturbing in the testimony from GAO was that more than one-third of auctions reviewed by the GAO in their report had only one bidder, and over half of auctions were used to procure items from pre-existing contracts.
…There’s a notion, said Mackin, that reverse auctions result in the lowest price. But at times the final price exceeded the government estimate and agencies may have been able to get a better price through other mechanisms…
GAO auditors also found issue with FedBid’s savings calculation across the four agencies GAO analyzed, which according to Mackin, was an estimated $98 million in 2012.
…”We have questions about the accuracy of these savings. For example, if there was no interactive bidding, agencies perhaps could have gotten a better price using other mechanisms,” she said. “Also, the target price or government estimate may not be sound. For example, we found over 1,000 cases where the winning bid actually exceeded the government’s estimate even with interactive bidding.”…
Some of the most insightful testimony came from construction firms, who denounced the use of reverse auctions. Nigel Cary, president of Cox Construction Co., discussed the negative effects of using reverse auctions  for complex construction projects, and further stated agencies are hindering competition on specific contracts due to issues with unrealistic requirements for unrealistic prices.
“Reverse auctions ignore best value,” he said. “It’s unfortunate and misguided that each agency learns the lesson on their own.”
Not to be outdone was Louis Celli Jr., director of the legislative division of the American Legion, who shared the message with the Committee on how his members feels about reverse auctions, as he stated that his members believe reverse auctions “unfair, deceptive and fraught with cheating.”
What is the path forward?

It seems that reverse auctions are a “love them or hate them” proposition. The vast majority of small businesses I know who actively use reverse auctions have negative attitudes toward the use of this tool, for the same reasons highlighted in the testimony. The overwhelming feedback is that they are being used for the wrong procurement (e.g. wrong requirements for the wrong price point), and not necessarily think that reverse auctions in and of themselves are a negative procurement method.


What do we do about this issue? Some solutions that were offered at the hearing included increased oversight and training, and passage of H.R. 2157, which prohibits the use of reverse auctions on construction contracts which are specifically suitable for awards to small businesses. Mackin also stated that the Office of Federal Procurement Policy (OFPP) has also agreed that new guidance is needed.
Right Tool
Nonetheless, I think construction contracts are the wrong requirement for reverse auctions, as sealed bidding is a preferred method to ensure best value, and ensure the right vendor, with the right requirements, at the right price.
Further, OFPP guidance, along with oversight, is clearly needed, as reverse auctions seem to be doing more harm than good. 
We’ll see what comes of this, but I hope reverse auctions do not go away entirely, as I am not a fan on taking tools away from the procurement process. We just need to do a better job of using the right tool for the right job.

Monday, March 11, 2013

Certification and Competition, Don’t Move the Goal Posts


Office of Federal Procurement Policy Administrator Joe Jordan recently got some much needed feedback on the debate about insourcing and outsourcing, and how those decision are being made. However, the insourcing versus outsourcing issue is not just external to the government.

A recent trend seems to be developing where Contracting Officers are inserting VetBiz verification requirements in Service Disabled Veteran Owned Small Business (SDVOSB) set-aside solicitations. The Air Force and the Federal Aviation Administration (FAA) have done this recently, and this trend is happening all too often. I have seen this requirement before, and I do not understand how this can be legal, given that the FAR does not require VetBiz certification, nor does the Small Business Administration (SBA) for SDVOSB certification. This is a requirement for Veterans Affairs (VA) and the VA ONLY, yet I believe this trend will continue until someone stands up and brings this to the attention of the proper entity to rule on this seemingly illegal requirement.

A company called 347 Construction Group brought this up in a recent protest, but it was done through the  SBA. The SBA’s Office of Hearings and Appeals (OHA) shot down the protest in their decision, and noted:

…Bid protest allegations must be raised at the U.S. Government Accountability Office (GAO) or other similar forums, not at OHA…

…OHA lacks jurisdiction to decide whether the Air Force properly excluded Appellant from the competition…

Firstly, it drives me crazy when small businesses don’t understand fundamental contracting actives like filing deadlines to file a protest, but it goes to a bigger issue of feeding the beast of perception by some in government and large primes that small businesses lack the general education of being government contractors.

This requirement was also a great example of what pre-award protests are for, since this requirement should have never made it into the final solicitation to begin with. This requirement is unduly restrictive to competition, and SBA allows self-certification. Those are the facts, and the Air Force should have been held accountable for changing the goal posts and the rules, but 347 blew it.

More importantly, why on Earth did 347 “protest” to the SBA? Again, they lacked the knowledge they needed to take the proper corrective actions. You can read all about it in FAR Subpart 15.5, Preaward, Award, and Postaward Notifications, Protests, and Mistakes. However, a simple Google search on “protesting a federal contract” would include dozens of sites that would have helped guide 347.

I certainly understand the intent of the Air Force and FAA in wanting to ensure legitimate SDVOSB companies win their contracts, but this is not how it should be done. The current process at the VA in certifying veteran and service-disabled companies is challenging to say the least, with a 50% rejection rate, a myriad of bureaucracy and landmines, and an ocean of paperwork to prove legitimacy that makes one think the contractors that are working for VA are being paid by the page. Things are improving, but have a long way to go.

This is an unfortunate issue, and one that I hope gets corrected by standardized processes for all socioeconomic designations to be properly certified by the SBA, much like the 8(a) program. However, I do not think the VA program I working. The VA should instead work on their backlog of claims for our veterans, not getting into a program they have no business being in to begin with. That is what the SBA should be doing.

Tuesday, September 18, 2012

Buying In Now Effectively Policy Across Government

In a recent breakfast  hosted by the Coalition for Government Procurement, Office of Federal Procurement Policy Administrator Joe Jordan effectively punted on the notion of best value versus the realities of federal procurement; lowest priced offers win contracts.

…Generally speaking, he said industry likes best-value procurements. They allow companies to propose higher prices, since officials will consider other evaluation criteria beyond price. On the other hand, the government is pushing low price and not always fully analyzing the entire lifecycle of a project, Jordan said. Both sides have good arguments, so the contracting officer's judgment is the final arbiter….

Due to the intense focus on budget cuts, and sequestration still casting a very ominous shadow on the federal government, price has become the most important factor in any source selection, and will remain so for the foreseeable future.
Any talks of best value are out the window, so agencies should state as such in their solicitations. The issue really is about how do determine technical acceptability, given the foundations of what are normally poorly defined requirements.
Firstly, requirements for proper use of Lowest Price, Technically Acceptable (LPTA) should be very standardized, commodity based purchases that require no other factors other than price. That means just the commodity itself through very rigid, specific, and accurate requirements. No opportunities for customer service, shipping, transport, customization, etc. These requirements require the use of best value, and the ability to offer better service.
You get what you pay for. There lies the rub.
Often times, the government simply does not know what it wants. It thinks it does, so it puts horribly written Requests for Proposal on the street, that result in dozens and dozens of questions, since the requirements are either redundant, confusing, circular logic, not achievable, unrealistic, boilerplate and not applicable, etc. Further exacerbating the problem is the lack of engagement with industry during the pre-acquisition phase, assuring poor requirements. Lack of leadership, poor capabilities, and the excuse of lack of time are the usual suspects.

The pressures to save money are overwhelming, so prices are driven downward to unrealistic levels. Is anyone still doing cost realism assessments? You know the answer.

How often does the Government Accountability Office sustain a protest where the losing offeror, and often an incumbent, claims they lost to a competitor who underbid them by 40%, even though the incumbent knows exactly what the real cost of doing, at a satisfactory level, entails?

This vicious circle ensures performance will fail, and it is the lack of a long-term focus that is troublesome. Poor leadership, combined with continued declines in the skills and capabilities of the acquisition workforce (I include PMs in that bunch) have created a perfect storm of continued poor performance and waste. Just look at the fiasco that is the System for Award Management (SAM) for a perfect example of this.

The General Services Administration can claim SAM was best value, but price is kingmaker. “Buying In” is seen as an improper business practice per Federal Acquisition Regulation 3.501, but it seems to be standardized now.

Investment analysis is a foreign concept, since saving a few bucks today will lead to inevitable rise in costs tomorrow, failed programs, and poor performance.

Awarding to the lowest bidder is a disaster waiting to happen. Only when innovation is desired, through the use of performance-based contracting, combined with properly written requirements and effective contract management and execution, can best value be realized.

That is the best outcome for the taxpayer. Easier said than done.

Tuesday, June 26, 2012

Protest Accountability: Time For Enforcement

Protests are back in the news, although they never really left. I have been writing about this issue for some time (here and here), but the problem has only exploded in the last five years with the economic implosion, and now sequestration and budgeting Armageddon possible on the horizon.

A recent report from IBM’s Center for the Business of Government also highlight similar issues, but some of the recommendations made in the report are either not realistic or have no chance at implementation.

The current state of the acquisition workforce, and I am including the program office who will (or should) be evaluating a proposal, simply will not allow many of these recommendations to see the light of day.

The report should have focused on the only issues that need leadership support, which is to create confidence in the contract award decision, and to ensure industry understands the requirements, evaluation criteria, and why they did not win a contract.

Nonetheless, the current state of affairs when it comes to protests is only going to worsen unless accountability is brought into the fray.

Looking at the recent Government Accountability Office (GAO) report on protests, it is hard to not think that protests are out of control. Here is where I strongly agree with IBM’s report, as I have been an advocate of protest accountability for some time. How can one argue that some protests are not simply frivolous? I know of a company, an incumbent on a contract that lost a recompete, who admitted filing a frivolous protest to bilk the government for another three months of revenue while GAO made the decision. The basis for the protest bordered on absurd, but how often does that happen? More often than you think. It is a business decision no doubt, but only at the expense of the taxpayers and the mission.

Protests are disruptive, and firms need to be held accountable for reimbursing the government for losing protest after protest. Further, this is a demonstration of a bad actor, and should also be included in a firm’s past performance rating.

Conversely, firms should automatically be compensated for protests fees should they be upheld. It is a two-way street, and needs to be treated as such.

Protests are a fundamental right by a firm to correct a deficiency by the government. However, the data indicate that this right is being abused. Let’s bring this situation under control, and move forward.

Saturday, February 18, 2012

Keep the Doors To A Protest Closed

There is no question that protests are dramatically on the rise. Outside of the data, one only need look at the Government Accountability Office (GAO) decisions to see it. I subscribe to this daily alert of decisions from GAO, always on the look out for protests that get sustained. Although the levels are actually falling as protest rise, I have to just shake my head at protests that get sustained as a result of an all too often fatal mistake by procurement oficials: improper discussions.

A recent GAO decision sustaining a protest illustrates this issue and procedural violations that should not occur. According to the Digest:

…Protest that agency engaged in discussions with the awardee, but not the protester, is sustained where record shows that awardee was permitted to make material changes to its quote that had the effect of rendering its original, technically unacceptable quote acceptable, but the agency did not afford protester an opportunity to revise its quote…

What basically happened here is that the General Services Administration (GSA) made the decision that discussions with this one offeror were simply clarifications, and thus did not warrant communications with all offerors. This decision regretfully happens with regularity, as contracting officers are trying to work through the process and not delay it.

Further, discussions can create significant more work for both the contracting officer and the evaluation team. The problem with these decisions is that clarifications are often not treated as the basic changes they should be. In fact, the intent may have been to correct basic errors, but they evolve into more material changes.

Certainly contracting officers are not acting in bad faith, but a cutting corner exercise nonetheless that opens protest doors needlessly.

Simply put, government officials should be very careful in communicating with some and not all offerors. Although offerors should be instructed in the solicitation that discussion items area at the government’s discretion (and to submit your best and final proposal), discussions under a “best value” Federal Acquisition Regulation (FAR) Part 15 process are normally perfunctory due to poorly written requirements, a poorly submitted proposal, or as usually is the case, both.

Best Practices for Government 

Ensure that FAR Subpart 15.306 is being followed regarding communications with offerors. Discussions will occur when an agency indicates to an offeror the significant weaknesses, deficiencies, and other aspects of its proposal that could be altered or explained to materially enhance the proposal.

In other words, the “acid test” for deciding whether discussions have been held is when an offeror has been provided the opportunity to modify its proposal, and improve the chances of contract award. Keep this in mind with communications.

Further, do not pick and choose the types of weaknesses and deficiencies that are communicated with the offeror. This is another fatal flaw that I have seen with alarming frequency. Just because you do not think it is important does not mean it should not be communicated, as I can assure you that the offeror will think it is important.

This “non-important” deficiency or weakness could be the one differentiator that the offeror needs to be selected for an award. Protests can be put soundly in the “sour grapes” category and never be sustained through following processes to the letter, ensuring the contract award is properly documented, and proactive communications to provide transparency and confidence in the contract award decision.


Best Practices for Industry 

Do not be satisfied with the “no phone calls or emails” attitude of some procurement officials. Transparency needs to be demanded, especially when it is not forthcoming.

GSA’s defense in the protest decision is common, not to mention alarming. How many times are clarifications actually discussions, but never discovered?

Companies need to be diligent and keep an eye on the contract award process to ensure competitors are not being given an upper hand unfairly. That does not mean harass extremely busy contracting personnel, but again, don’t be satisfied if you encounter a “closed door” policy.

Wednesday, November 23, 2011

GAO and Success: Acquisition Workforce the Common Factor

With the collapse of the Congressional “supercommittee’s” budget deal on deficit reduction, federal managers, and their industry counterparts, are being told to prepare for the worst , as possible mandatory cuts are on the horizon for 2013.

In the mean time, federal managers will need to continue to find ways to save money and do more with less. To help programs succeed, the Government Accountability Office (GAO) recently came out with a report that highlights best practices for IT acquisition and execution. Combined with the Office of Management and Budget's 25 point IT reform plan, these two products create a powerful blueprint for what programs should be doing to improve outcomes, and be considered successful by meeting cost, schedule, and performance goals.

The one common denominator for program success is a steady, skilled acquisition workforce to execute these other principals. This should not come as a surprise. However, what was surprising is that the Defense Information Systems Agency's Global Combat Support System-Joint program did not list this fact as a critical success factor (similar to 6 out of 7 dentists recommend flossing for healthy teeth? Who actually goes to that one dentist?)

Putting aside the other factors, having a skilled, trained and stable acquisition workforce is critical to success in any program, and more than now than ever. The acquisition workforce, especially in contracting, must be able to act as business advisors and really lead the way in helping shape sound business practices. This includes pre-acquisition through contract execution. The program manager, in addition to the use of Integrated Program Teams, also are critical to ensuring that everyone is building requirements properly, proper contracts and metrics are in place, and then of course executing using the sound business practices categorized in the GAO report.

Regretfully, these budgets cuts and contract reductions can only be a detriment to implementing these best practices. With hiring freezes, reducing training budgets, and mandates to cut services contracts (such as acquisition support contracts), fewer opportunities will exist to improve performance. Coupled with the "low price at all cost" contract selection methodology, a thousand cuts are on the way to an environment of even further reduced performance, in addition to more fraud, waste, and abuse.

GAO and Inspector Generals will be quite busy in the next 24 months, but reports of program success will more than likely be a distant memory in this future timeframe.

Sunday, October 2, 2011

Performance Outcomes: Judgment Day is Coming

So Fiscal Year (FY) 2011 is now in the books, and the new government FY 2012 begins. I don't think anyone can argue that this end of FY was one of the most challenging end of FYs in recent memory, with budgetary issues and Continuing Resolutions adding to a sense of doom in industry, if not outright confusion and desperation in most government procurement shops. Many of the acquisition divisions at federal agencies did not have a clear sense of what the budgets and fiscal environment for the rest of the year would be, thanks to a dysfunctional political system and a Congress willing to sellout stable government operations in the name of political sensationalism and outright partisanship at the expense of the nation.

From what I have seen over the last few months and winding up this FY, coupled with the bleak fiscal horizon in the next few years, government operations are in serious trouble. Frankly, if you think government operations are bad now, you ain't seen nothing yet. The Government Accountability Office, Office of Management and Budget, and other watchdog groups and organizations can expect their workload to increase to the point of trying to move a mountain with a shovel.

One only need taking a look at what is happening with alarming regularity, and will no doubt continue as the government continues to find ways to save money and reduce the amount of contractor support and contracted dollars; low price is the only price.

Granted low price, despite illusions of "best value" has always been around, things seem to be spiraling out of control. I have seen with alarming frequency contracts be awarded to low-priced bids, at prices that are ridiculously low compared to both other bidders and government estimates. Sometimes 20% or more below. So much for price not being the most important factor. Price reasonableness and realism? Looking at the bottom-line figure is not enough. Sometimes performance costs money, and should actually save money in the long-run. That is a concept seemingly lost on procurement officials right now.

Although "buying in" is a prohibited practice according to the Federal Acquisition Regulation, it has now become a sanctioned activity. Expect to see many more fixed priced contracts, despite the requirement, in addition to modification after modification. Performance will be an afterthought, as multipliers in industry (the final amount that a contractor bills the government for a dollar of labor, often referred to as “loaded” cost) get lower and lower. Anything less than 2.4 is considered inexpensive; with 2.4 – 2.7 the norm and anything greater than 2.7 considered expensive. I have heard of firms lowering their multipliers to 1.9 to be competitive. Competitive? How can you be profitable?

Size is the answer, as only very large firms can absorb that type of contract strategy. Make it up in volume, and the modification circus that poorly written and "cheap" contracts is also another outcome. This strategy simply decreases competition, especially for small businesses, and will result in even further poor contract performance. Just what we need. Forget about even developing proper requirements, as that is now a cost driver.

So how to you staff these contracts if you are "lucky" enough to win a contract? Answer: on the cheap. Hire know-nothing consultants straight out of college or inexperienced staff to support the requirement, pay them rock-bottom salaries with little if any benefits, and put them through the sausage grinder for a couple of years. Repeat the process. How will government get any decent performance? The current environment and abilities of the acquisition workforce are not conducive for governance and oversight as it is. Now you're going to expect them to provide even more?

Industry: How are you planning to succeed in this environment? What adjustments are you making? What experiences have you had in this "new" low-cost paradigm?

Government: What are you doing to ensure performance with such a low-price? What price reasonableness and realism checks are being done? What technical acceptability checks are being done?

Wednesday, August 10, 2011

Your Taxpayer Dollar$ at Work: Volume II

Last year I started a series to highlight outrageous cases of waste, fraud, and abuse by the federal government. In the current environment of complete political theatre and legislative dysfunction leading to budget crises, debt ceilings, and continuous resolutions, I can probably write a book with so much material. However, I wanted to focus on a truly outrageous case of fraud and waste that is shocking, even when we succumb to the worst stereotypical fears of our government.

According to a recent inspector general report at the Department of Veterans Affairs (VA), $540 million dollars annually worth of business is being awarded to companies that fail to meet eligibility requirements for veteran owned small businesses or service-disabled veteran owned small businesses. The report stated these results were extrapolated from audit results, which assumes $540 million, and could add up to $2.5 billion over the next 5 years. The report further estimates that factoring out ineligible businesses, the VA only awarded 12 percent of its procurement dollars to actual veteran owned small businesses (VOSBs) and 10 percent to service disabled veteran owned businesses (SDVOSBs), as opposed to the 23 and 20 percent it said it did during fiscal 2010. Half a billion in estimated fraud? Give me a break.

The main culprit, not surprisingly, is the lack of accountability, according to testimony before the House Veterans Affairs' subcommittee on oversight and investigations by Belinda Finn, assistant inspector general for audits and evaluations at the VA OIG.

…Ineligible businesses received awards because VA's office of small and disadvantaged business utilization was not thoroughly reviewing business documentation and performing site visits to verify the veteran-owned status, said Finn. The OIG also found that contracting officers did not always check VA's enterprise veterans database, business size classification codes, or properly assess subcontracting and partnering agreements…

Once again the lack of resources and strain on the acquisition workforce was blamed, although this is a false argument. There is absolutely no excuse for not verifying eligibility of a firm for these types of set-aside programs, not to mention the subcontracting and partnering agreements. Where is the protection of the public’s trust?

Also of note is that only 30% of service disabled veteran contracts are with the VA, so this is a widespread issue. Obviously unethical firms and individuals are taking advantage of the lack of oversight, but there is no reason why VOSBs and SDVOSBs should be self-certifications. These programs should have formal certification processes similar to 8(a).

Although the VA has verification programs in place through its Center for Veteran Enterprise, it is woefully inadequate and cumbersome. You need your DD-214, adjudication letter from the VA (for SDVOSB), and corporate documentation showing 51% ownership and control. That is it. The current document requests are intrusive, and privacy is a risk. Explain to me how requiring 14 voided checks proves I am eligible?

Taxpayers are at risk in this program, and I hope the government, especially at the VA, understand the depths of this massive fraud being per perpetrated on taxpayers and veterans.

Thursday, September 2, 2010

Behind the Curtain: Communications in the Acquisition Process

With the end of the fiscal year comes the right of passage for government contracting personnel and contractors alike; the end-of year budget dump or as I like to call it, the end of fiscal year feeding frenzy. This time of year is characterized by the worst practices in federal contracting: lack of any real acquisition planning, abundance of improperly justified sole-source contracts, and the overall lack of meaningful competition.

Coming off the heels of a new report by GAO on the lack of competition, one clear issue is the woefully inadequate communication between industry and government.

The SBA takes the general position that a procuring agency does not need to document in a contract file any other prospective sources if the agency selects an 8(a) participant to perform the requirement, offers it to SBA, and SBA accepts the requirement into the 8(a) program. SBA officials note that it is the procuring agency’s responsibility to conduct market research to determine whether the requirements of the Small Business Act can be met, and then to determine the appropriate contracting vehicle to use. However, SBA considers market research requirements to be satisfied when a participant in the 8(a) program self-markets its abilities to a procuring agency and is subsequently offered a sole source 8(a) requirement. When we discussed this issue with procurement policy officials at DHS, they said that, while these activities may meet the regulatory requirements, in practice they like to see additional market research so that the offer to the 8(a) firm has a more solid basis. {Emphasis added}

Get it off one’s desk seems to be the prevailing attitude, along with the closing down of accepting any new requirements to handle the end-of-year rush to get dollars out the door. Is it just simple correlation that more procurement activity carries more risk of protest? If so, then something has gone wrong.

To improve competition and get meaningful best value outcomes, communication with potential vendors is an essential part of the market research process. Common forms include written exchanges of information (e.g., submission of marketing materials or responses to Requests for Information), in addition to also meetings with potential vendors.

However, it is the risk aversion and untrained contracting officials, combined with poor integration with program management and contracting that often makes this process difficult. A recent article in Government Procurement magazine shared a similar sentiment:

This concern can have a chilling effect on communication with vendors. In response to a request for a meeting prior to release of an RFP, one state official recently wrote: “If I meet with them even as an introductory meeting, then I assume they understand they will be precluded from bidding on any project we bid out the next six months.” Is this level of concern by state and local officials warranted? We think clearly it is not.

Nor do I. In fact, Federal Acquisition Regulation (FAR) Part 15, “Contracting by Negotiation,” balances the dual goals of “openness” and “integrity” in the procurement process by specifically encouraging pre-RFP meetings and exchanges of information between public officials and potential vendors. Good acquisition planning needs open communications, not to mention the FAR specifically identifies “one-on-one meetings” as an appropriate means of accomplishing these exchanges. Program Managers needs to ensure they know what is appropriate, and Contracting Officers need to provide this guidance and act as business advisors in this process. Simple processes to help alleviate end-of-year fiascos before they happen.

What really are the goals here? Openness, transparency, and fairness for starters. Procurement official must treat all potential vendors impartially and provide equal access to all. This ensures the process is fair. For these reasons, I believe initiatives like the Better Buy Project are an important tool to meet these procurement goals, since crowd sourcing is the foundation for access to all, along with Acquisition 2.0 tools that continue to provide the transparency and openness required of the contracting process.

An informed understanding of current industry capabilities and practices results in both better RFPs and better contracts, since industry will have participated in requirements development to ensure fairness, but also realistic objectives and schedules to also help ensure positive outcomes.

More communication with industry promotes more competition, better solutions and better pricing. Ambiguity in the final RFP translates to misaligned solutions or risk for a vendor who responds with higher pricing. The latest developments, especially in such complex fields as information technology, healthcare and environmental sciences, are difficult to harness unless you put industry competitors to work for you.

Let’s capture innovation and stop reinventing the wheel, as I too believe it is ridiculous to think that government officials are so easily manipulated or influenced with these approaches that communications and Acquisition 2.0 initiatives will rig procurements. It is risk aversion and the lack of accountability indicative in the procurement process that acts as barriers to success. Continued advancements through Acquisition 2.0 pilots will hopefully not only demonstrate the potential of openness and transparency, but also provide guidance on transforming the way government does business and allow for accountability to the taxpayer, which should be the ultimate goal.