Monday, May 11, 2015

Politicians and Protests Don't Mix

blog.theodorewatson.com
According to language included in the National Defense Authorization Act (NDAA), which passed out of the House Armed Services Committee on April 30, Congress is seeking answers to the recent surge in protests the last few years.
The NDAA has a provision instructing Defense to commission a study regarding how Defense contractors are using the protest process in their favor, or simply manipulating the system.
I believe the Government Accountability Office (GAO) has already addressed these issues in their latest report to Congress (here). Also troubling is the desire to use a Federally Funded Research and Development Center for this analysis, which is a troubling potential contracting issue in and of itself.
Allow me to answer the commission's questions and save the taxpayers untold millions:
The issues this “commission” is tasked with analyzing include: 
(1) If contractors who currently have a DoD contract enter a bid protest to delay the implementation of new contracts that would draw business away from the old one. The Government Accountability Office has up to 100 days to review a bid protest and render a decision.
I have had only one contractor be candid with me about it, but of course you are going to protest in this situation as the incumbent! Honestly, what do you have to lose? You lost the contract, and that is 3 extra months of revenue. What is the downside? Some would argue bad faith, strained customer relations, etc. Ninety more days of revenue trump these concerns, especially in this cutthroat, hyper-competitive government contracting market. 
(2) The extent to which companies file a bid protest even when they do not believe the Defense Department made an error in order to delay or otherwise disrupt the process.
I call these protests “sour grapes,” and no attorney worth their salt will admit to them, since the attorneys, in my opinion, are the only ones that win here. Some firms just get bad legal advice, other firms may just not know any better.
However, I have had several companies tell me that these protests were filedsimply because the risk averse contracting community is not providing enough information in the debrief process to give contractors confidence in the contract award decision.
Therefore, these protests are filed in hopes of digging up some dirt, and ultimately exerting pressure on the Contracting Officer for the ultimate goal of the protest and the third issue;
(3) Whether there are net benefits for companies filing a protest or indicating they plan on filing a protest.
The statistics show that this is the real path to protests, getting another bite at the apple in some form or fashion through corrective action. 
This effectiveness rate, which held steady at 43 percent of all cases filed last fiscal year, and as reported by the GAO, is the important figure. Nearly half of all protests ended by having the protested agency take some action. Those are pretty good betting odds.
This corrective action might take the form of pulling and rewriting objectionable parts of the solicitation, brokering with the protestor to win work with the winning contractor, or reevaluating the losing contractor's proposal.
The buying environment is creating the protests pressures on both sides, and the continued lack of communications and collaboration with industry by government exacerbates the issues. Further, many firms use protest after protest as part of their contract development strategy, with little consequence since the protest process is ripe for abuse. 
We do not need Congress to waste money on reports and committees that provide little useful information. Instead, taxpayers would be better served by properly resourcing government management and demanding accountability for results.

Sunday, August 19, 2012

Contractors and Procurement Officials: Customer Service Is A Two Way Street

There seems to be a development that is coming more and more to the forefront: the case of the out-of-control Contracting Officer (KO).

There are usually two paths to interactions with a KO, one being the KO who is overwhelmed with the workload, doing the best they can to handle it, and simply have very little interactions with the contractors. Further, these KOs are very professional, and want to help and guide businesses to be successful, especially small businesses.

This path I would say is the vast majority of the 1102s, and the environment that most contractors work in. That is to say that contract execution, and subsequent performance or contract issues, result in interactions mostly with Contracting Officer’s Representative (COR), and the Program Manager (PM). If you are dealing with the KO, you have some serious problems.

However, there seems to be encroachment in federal acquisition, and government contracting in general, of the second path of KOs, those who act as KO, COR, PM, judge, jury, and executioner. These KOs take advantage of their power over the contractors, and are the first to threaten termination when issues arise in performance, both actual and perceived.

I started a discussion on GovLoop about this topic, but it was something that perhaps no one wants to discuss. Certainly the manifestation of inexperience and subsequent performance issues by 1102s was covered recently in the Washington Post, but talking truth to power and holding those in power accountable can always be difficult, especially with vindictive acquisition personnel.

It should not, and does not, have to be this way. For every conversation I have with a small business colleague on a great relationship with a client, there seems to be another where a company is being crucified for one cent on an invoice, then being threatened with poor past performance and possible termination. What has gone wrong?

I think the pressure cooker that is being an 1102 is creating an environment where those in the trenches are being left to their own devices, without proper leadership, guidance, and direction. Since training on being a business advisor, negotiating, customer service, or understanding how businesses function is effectively non-existent, bad habits develop. Left unchecked, these bad apples rotten the organization, and it seems like more and more rot is advancing. Further, those bad habits get exacerbated by firms that get bullied and intimated, and enable this behavior because they fear being retaliated against through options that get dangled like weapons, or through adverse past performance.

Something has to give.

The mission has to come first, and the “gotcha” attitudes simply help create more problems for performance by both parties. Many contracts call for monthly meetings with stakeholders to discuss issues, and these platforms should be productive ways to help resolve problems, and help create trust and attitudes that enable an environment to work like partners, not adversaries.

It has been alarming at the rate of complaints by small businesses to small business advocates at federal agencies of maltreatment by procurement personnel, and the rise of protests is also a manifestation of these negative and mistrustful attitudes.

Of course, some companies deserve what they get when they under bid work, don’t perform, and simply use the government as an ATM.

However, contracts are expected to provide exceptional service for the taxpayer’s investment. That is a given, and understood. Nonetheless, that goal is a two-way street, and requires both parties to act in the best interest of the taxpayer.

Can’t we all just get along?

Sunday, August 12, 2012

Protest Accountability: Mechanisms to Improve Performance

Protests are back in the news, although they never really left. I have been writing about this issue for some time (here and here), but the problem has only exploded in the last five years with the economic implosion, and now sequestration and budgeting Armageddon possible on the horizon.

A recent report from IBM’s Center for the Business of Government also highlight similar issues, but some of the recommendations made in the report are either not realistic or have no chance at implementation.

The current state of the acquisition workforce, and I am including the program office who are (or should) be evaluating a proposal, simply will not allow many of these recommendations to see the light of day.

The report should have focused on the only issues that need leadership support, which is to create confidence in the contract award decision, and to ensure industry understands the requirements, evaluation criteria, and why they did not win a contract.

The critical components that need attention:

Requirements

Poor requirements lead to contract failures, and protests of course. Garbage in equals garbage out, and that cannot be truer when it comes to procurements and subsequent contract award decisions.

Bundled, complex requirements, with hundreds of moving parts, combined with evaluation criteria that do not make sense, is a formula for almost automatic protests.

This is where performance-based contracting comes into play. Focusing on objectives and needed outcomes is where government should be, allowing industry to help solve problems and achieve the ever-illusive outcome: innovation. Instead, the current paradigm is stuck in a quagmire of government’s need to be overly-prescriptive, leading to confusion and poor requirements since industry has the edge in technological knowledge and capabilities. 

Keep requirements simple, use market research to communicate needs and allow industry input, including proper evaluation criteria.

Source Selection Management

Source selections are currently treated as a chore; an unwelcome ancillary duty by government personnel who do not have time for more taskings and who are under pressure from their respective leadership to perform other duties. Further, many senior leaders do not allow their personnel the flexibility needed to focus on a source selection, instead treating it with lesser importance than their subordinate’s day-to-day jobs.

The report makes some good recommendations in this area, but it is leadership that needs change to help them understand the importance of making sound business decisions through effective support of source selections.

I cannot count how many times I have supported a source selection in my consulting career where managers refuse to allow their personnel to focus on a source selection properly. The result is massive frustration and confusion, by both offerors and the evaluation team.

Another significant issue is training, as many program managers are simply not aware of proper evaluation processes, especially when it comes to documentation. Disturbingly, I have also seen many contract specialists also lack these fundamentals.

It is simply a fact that if a contract award decision is transparent and properly documented, this normally leads to confidence in a contract award decision by those in leadership charged to ultimately make the contract award decision, and hopefully industry.

A well-documented source selection, that has followed transparent and proper procedures, combined with effective debriefings, will go a long way to offsetting protest activity.

Transparency

This should include redacted source selection plans and documentation for the losing bidder, which incudes legal and peer review.

The trust issue, as the report mentions, is simply deteriorating to the point of frightening proportions. This should start as early in the acquisition process as possible, but again the fear-factor prevents government from collaborating with industry effectively, at the detriment of the requirement and the ultimate contract award.

Government personnel need to understand that if they do their jobs properly, protests should be sour grapes. It is the risk-aversion here that is a major issue.

Nonetheless, the current state of affairs when it comes to protests is only going to worsen unless accountability is brought into the fray.

Looking at the recent Government Accountability Office (GAO) report on protests, it is hard to not think that protests are out of control. Here is where I strongly agree with IBM’s report, as I have been an advocate of protest accountability for some time. How can one argue that some protests are not simply frivolous? I know of a company, an incumbent on a contract that lost a recompete, who admitted filing a frivolous protest to bilk the government for another three months of revenue while GAO made the decision. The basis for the protest bordered on absurd, but how often does that happen? More often than you think. It is a business decision no doubt, but only at the expense of the taxpayers and the mission.

Protests are disruptive, and firms need to be held accountable for reimbursing the government for losing protest after protest. Further, this is a demonstration of a bad actor, and should also be included in a firm’s past performance rating.

Conversely, firms should automatically be compensated for protests fees should they be upheld. It is a two-way street, and needs to be treated as such.

Protests are a fundamental right by a firm to correct a deficiency by the government. However, the data indicate that this right is being abused. Let’s bring this situation under control, and move forward.

Saturday, February 18, 2012

Keep the Doors To A Protest Closed

There is no question that protests are dramatically on the rise. Outside of the data, one only need look at the Government Accountability Office (GAO) decisions to see it. I subscribe to this daily alert of decisions from GAO, always on the look out for protests that get sustained. Although the levels are actually falling as protest rise, I have to just shake my head at protests that get sustained as a result of an all too often fatal mistake by procurement oficials: improper discussions.

A recent GAO decision sustaining a protest illustrates this issue and procedural violations that should not occur. According to the Digest:

…Protest that agency engaged in discussions with the awardee, but not the protester, is sustained where record shows that awardee was permitted to make material changes to its quote that had the effect of rendering its original, technically unacceptable quote acceptable, but the agency did not afford protester an opportunity to revise its quote…

What basically happened here is that the General Services Administration (GSA) made the decision that discussions with this one offeror were simply clarifications, and thus did not warrant communications with all offerors. This decision regretfully happens with regularity, as contracting officers are trying to work through the process and not delay it.

Further, discussions can create significant more work for both the contracting officer and the evaluation team. The problem with these decisions is that clarifications are often not treated as the basic changes they should be. In fact, the intent may have been to correct basic errors, but they evolve into more material changes.

Certainly contracting officers are not acting in bad faith, but a cutting corner exercise nonetheless that opens protest doors needlessly.

Simply put, government officials should be very careful in communicating with some and not all offerors. Although offerors should be instructed in the solicitation that discussion items area at the government’s discretion (and to submit your best and final proposal), discussions under a “best value” Federal Acquisition Regulation (FAR) Part 15 process are normally perfunctory due to poorly written requirements, a poorly submitted proposal, or as usually is the case, both.

Best Practices for Government 

Ensure that FAR Subpart 15.306 is being followed regarding communications with offerors. Discussions will occur when an agency indicates to an offeror the significant weaknesses, deficiencies, and other aspects of its proposal that could be altered or explained to materially enhance the proposal.

In other words, the “acid test” for deciding whether discussions have been held is when an offeror has been provided the opportunity to modify its proposal, and improve the chances of contract award. Keep this in mind with communications.

Further, do not pick and choose the types of weaknesses and deficiencies that are communicated with the offeror. This is another fatal flaw that I have seen with alarming frequency. Just because you do not think it is important does not mean it should not be communicated, as I can assure you that the offeror will think it is important.

This “non-important” deficiency or weakness could be the one differentiator that the offeror needs to be selected for an award. Protests can be put soundly in the “sour grapes” category and never be sustained through following processes to the letter, ensuring the contract award is properly documented, and proactive communications to provide transparency and confidence in the contract award decision.


Best Practices for Industry 

Do not be satisfied with the “no phone calls or emails” attitude of some procurement officials. Transparency needs to be demanded, especially when it is not forthcoming.

GSA’s defense in the protest decision is common, not to mention alarming. How many times are clarifications actually discussions, but never discovered?

Companies need to be diligent and keep an eye on the contract award process to ensure competitors are not being given an upper hand unfairly. That does not mean harass extremely busy contracting personnel, but again, don’t be satisfied if you encounter a “closed door” policy.

Sunday, January 22, 2012

Can Communications Prevent Protests?


I was interested in hearing from both the vendor and 1102 community on the "triggers" of a protest, and if any best practices could be conducted to avoid a protest or avoid a protest from being upheld.
The post on GovLoop and LinkedIn elicited some great feedback, although it was interesting to see the source of the comments (e.g. industry or government). Although the comments from industry focused on debriefs, government commentors focused on process. Nonetheless, a few best practices that government should exercise were understood by all:
  1. Keep the evaluation as simple as possible;
  2. Tell the offerors exactly what you are going to evaluate;
  3. Evaluate exactly what you told the offerors you were going to evaluate; and when the source selection is over,
  4. Tell the offerors exactly what you did evaluate (and ensure it's what you said you were going to do---no more, no less). 
If the playing field is kept level for all players and the government has a reasonable rationale for source selection decisions, a protest may not be avoided, but the government will "win" by having the protest denied.
Nonetheless, in today's budget constrained environment, more companies are vying for fewer available government dollars, resulting in more protests. In the past, companies may have been hesitant to file a protest because there was another opportunity coming up or concerned about the relationship with the agency, but now the mentality is "throw something against the wall and see if it sticks." 
Here is the where the divergence exists, in regards to debriefs. Industry continues to complain about the seemingly lack of transparent and quality debriefs, or being told no debriefs because they are not required.
Questions:
  • Would you say your agency conducts transparent debriefs that encourage relationships and communications?
  • Are your agency's debriefs described as hostile and difficult by industry?
  • Are protests at your agency going up, and if so, why do you think that is?
  • If protests are going down or have been steady at your agency, what can you attribute to this decline or rate?

Monday, January 3, 2011

Protests Will Continue the Upward Trend in 2011

As 2010 is now officially in the books, one issue that we can expect to continue its trend in 2011 is contract protests. An interesting piece in the November-December 2010 Defense AT&L magazine discussed this issue, and illustrates the realities of the federal contracting environment. Mainly, budgets are tightening, competition for those shrinking dollars is ferocious, and protests have become standard operating practice.

A general impression of respondents was that protests have become more common; with nearly 70 percent saying pro- tests were either somewhat, or much more common. A striking result was that none of the respondents felt protests had become less common. That agrees with a recent Government Accountability Office (GAO) report that in fiscal year 2009, 1,989 protests were filed, a 20 percent increase over the 1,652 protests filed in fiscal year 2008, and up 50 percent over fiscal year 2006.

This article is telling in many ways, but what really is of interest are the responses, and their subsequent rankings. Ranked most important is that the protesting company expects to win, followed by the government making mistakes. This certainly seems to make sense, and is also consistent with what I have experienced. In talking to small business executives, it seems that protests are a valid way to verify if source selection procedures were followed. We have seen that go awry in the Air Force KC-X tanker program, where government officials were publically called out for not following their own procedures.

Also of interest is that the order of why protests are lodged in the first place does not seem to make sense, or is not what is experienced in reality. Respondents overwhelmingly stated they expect to win the protest, but the second reason is the critical to the analysis. Some executives I have spoken to tell me that protests are now becoming more operational policy, especially for large dollar contracts. Under the current environment, why not?

The current environment encompasses the second part of the article, where the real views of protests are on display. Predictably, shrinking opportunities and increased competition are major factors at stake, not to mention governmental factors of poorly trained acquisition workforce and poor government communications. So what to do?

I have discussed the need to rethink the protest process and why they occur here and here. As I received some pretty interesting feedback, mostly negative from industry, let me reiterate that protests are a legal and necessary tool to ensure fair competition and correct procedures for awarding contracts. However, this Defense AT&L article highlights why I think protests need to be rethought in regards to acquisition reform.

What I have an issue with is the seemingly endless cycle of protests with no consequences or accountability, both by government and industry. Industry can delay award of a contract, expect quid pro quo, or simply attempt to dig up dirt where none exists. I have been on both ends of this equation, and these strategies only help waste time and money for everybody, not to mention the user pays the price in continued loss of capability (again, look at the KC-X program). Industry looks at in terms of return on an investment, since the risk adverse nature of government may provide additional revenue sources of further opportunities to compete. Nonetheless, the government does make mistakes and should be held accountable.

The end result is that there needs to be a measure of accountability on both sides. A protest should not be taken lightly, as it is normally a disruptive and costly matter. The survey confirms that a company filing a protest expects to win, but reality states that sometimes that is not the case. Firms sometimes file protests to see what happens. I have seen this too many times to count. What if a firm losses, especially repeatedly? A measure of financially accountability to recoup costs for firms that take this approach is needed. Being accountable for phising expeditions should help the protests process be used for what it is intended: ensuring fair competition.

The government seems to also be in the habit of not wanting to deal with a protesting firm, as some government agencies award work to companies with reputations for protesting contract awards to avoid the cost of resolving disputes with those companies if the government losses and the cost of resulting project delays.

Leadership and accountability is needed to help stem this trend. Protesting is a right that industry must continue to have, but it needs to be measured and weighed against the “real” costs should accountability finally be placed into the equation. Further, government must stem the tide of allowing themselves to be bullied, but more importantly, be held accountable for following procedures, and executing sound acquisition strategies to ensure a protest is not even in the conversation.

We shall see what reform lay ahead, but we can only expect to see a continued rise in protest actions on the horizon, to the detriment of all involved.

Tuesday, November 3, 2009

Acquisition Reform Should Include Protest Actions

Recent reporting by Federal Computer Week (FCW) highlights an issue that is not being addressed by acquisition reform initiatives; reforming the contract protest process.

Writing in the Editor’s Notebook blog at Washington Technology, Nick Wakeman discusses the protest by Unisys and General Dynamics of TSA’s contract award to Computer Sciences Corp for the agencies information technology infrastructure.

According to FCW:

…the number of protests filed with the Government Accountability Office jumped 17 percent between fiscal 2007 and 2008, according to a December 2008 report. Part of that can be attributed to an increase in GAO’s jurisdiction. But even if you take that out, Wakeman notes, that still leaves a jump of 10.9 percent, which followed an increase of 6 percent the year before. In contrast, the number of protests had declined 2 and 9 percent in the preceding years…

I see three fundamental issues at play here that need to be addressed regarding this rise in protests:

1) Business Strategy

With such large awards like the TSA contract seemingly the norm for information technology, many companies cannot afford to not have the business. These contract wins are often built into the bottom line profit projections, so protests are a vehicle to open competition, or even go on fishing expeditions in hopes of finding errors in process that can sustain a protest. Further, there is now an understanding in the market that protests are almost a given for these large acquisitions, therefore companies competing for opportunities are creating internal process teams as part of proposal centers to execute protest actions as part of capture management.

Also reported by FCW earlier this year was a piece by Robert J. Guerra, a partner at consulting firm Guerra and Kiviat, who was horrified to receive an e-mail advertising a seminar titled “A Successful Bid Protest Can Produce a Contract Win.”

…“It is appalling that in a time when government acquisition personnel are under increased stress to conduct ever more complex acquisitions, we as a community should seek ways to protest more contract awards,” Guerra wrote in a Federal Computer Week column. “It isn’t bad enough that we already have protests that in many cases are ‘fishing expeditions.’ Now we want sales reps and managers pursuing protests as a way to make their quotas.”…

I also wrote about this phenomenon in a piece for Defense AT&L magazine, as the increase in protests is a sign that more companies are competing against one another for smaller shares of a shrinking market for multibillion-dollar projects. As a result of poor source-selection practices and award decisions, the government has opened the door for the opportunities to protest. Industry is simply taking advantage.

2) Acquisition Workforce

I do not think anyone is under any illusions that workforce issues are a common denominator for many acquisition problems, and protests are no different. There has been a significant decline in solicitation quality, with the subsequent rise in the number of mistakes or lack of adherence to policy and regulations being committed by personnel conducting source selections. Further, these issues have been exacerbated by poor leadership that allows this to happen.

This goes back to a constant theme of mine that the skills of the acquisition workforce need to be restructured to encompass the life cycle of contract management, to include requirements development, contracting, and program management. Business advisors, and well-trained ones at that, are what the workforce should be, combined with having the technology and tools to increase productivity and quality. Mistakes often happen because source selections are often conducted by disinterested parties with little to no background in contracting, the requirement, or training on process. Again it is not a focus on numbers, although obviously a larger workforce is needed, but also the quality and caliber of new hires that bring business management skills to the table. Knowledge transfer is also vital from the experienced contract managers for success on this front, to help reduce mistakes and errors that are easily corrected, and shut the door to protest opportunities.

3) Accountability

It seems that there was a time when companies that protested contract after contract received a reputation for being troublemakers, or unethical. Further, these companies were often shunned by industry as well for poor management and toxic reputation. Those days are now gone.

The fact of the matter is that there are little to no consequences for companies to protest, whether it is for one contract or many. This needs to change. Although I am not advocating for industry to lose the right to protest, there does need to be a balance of accountability to the taxpayers. The way the system is structured now, firms can protest at will without having to reimburse the Government if they lose, or reimburse the Government for damages, lost time, and expenses for defending the protest. Further, firms that often protest are no longer treated with any animosity, as it is just business as usual. Under these circumstances, what does a company have to lose? Very little. In fact, the current system encourages companies to protest since there are no consequences for being wrong, or filing what can be viewed as a “frivolous lawsuit.”

There needs to be punitive consequences for firms that protest. Certainly if protests get upheld, that is one thing. But firms that habitually protest and lose must be held accountable for the lost time and costs of defending the protest to the program. Further, firms that lose a certain number of protests in a given period should also be held accountable, such as being barred from competition for a set period of time.

I disagree with a statement submitted to Congress by GAO General Counsel Gary Kepplinger:

…Well-meaning attempts to ward off such protests “may have, on balance, the unintended consequence of harming the federal procurement system by discouraging participation in federal contracting and, in turn, limiting competition.”…

I believe these measures would actually help improve the quality of vendors who compete, as companies that waste taxpayer money will think twice before filing protests without actual justification. Only when firms are held accountable for their actions will we see real change. This is contract management and acquisition reform 101.

Although protests are not going away anytime soon, I feel that the current system needs to be relooked, as we cannot afford a process that allows industry to protest with impunity, bully and intimidate contracting officials, and waste taxpayer funds. A balance is needed, and badly overdue.